UKRNIIVODOKANALPROEKT (UVKP) - 70 years in research and development of water supply & sewerage systems, industrial / consumer wastes disposal, water works engineering.
With such a track record we are proud to call ourselves the specialists in this domain.
Environment-oriented design, wide expertise, strong commitment to meeting client needs make UVKP the best partner for the future industrial / civil engineering projects & waterworks design.
SUMMARY Headquartered in Kyiv, Ukraine, UVKP is a leading specialist in design,
development and implementation of tailing ponds and hydraulic transport systems for ore benefitiating plants, as well as water supply / waste water systems. Whatever the task, UVKP brings the experience and resources to meet challenges anywhere on the globe.
The UVKP - designed projects are being built, have been built and are currently and successfully operating over the CIS - in Russia, Bielorussia, Moldova, Georgia, Azerbaijan, Kazakhstan, Uzbekistan, Ukraine.
UVKP specialists have provided their technical assistance / consulting in Cuba, Mongolia, Afghanistan, India, Vietnam and other countries.
UVKP has proven through decades its capability of providing high quality services in engineering survey, design & development, and technical supervision of the construction of:
- Tailing ponds and ash/slurry dumps;
- Hydraulic transport systems;
- Industrial waste storages;
- Landfills for solid industrial / consumer wastes;
- Systems of water intake, treatment, finish and feed to consumers both for plant use and domestic / drinking needs from surface or subterranean sources;
- Industrial circulating water supply systems;
- Complexes for domestic / industrial sewage treatment;
- Water storages;
- Protection complexes against land underflooding and ground water contamlnation;
- Other systems and works related to water supply, waste water, wastes disposal.
UVKP focuses on a broad range of environmental protection measures. Modern technologies and a common sense approach are applied to ensure the most efficient and effective methods are utilized from research and development to construction and operation of each of its projects from landfilling and waste disposal to water supply systems.
Here are some examples of the projects that have been built and are successfully operating by the UKRNIIVODOCANALPROEKT design:
- Tailing ponds, industrial waste storages, ash/slag disposal areas
- Tailing ponds with hydraulic transport systems for Kryviy Rig Ore Concentration
Integrated Works (Severny, Centralny, Novo-Kryvorozhskiy, Yuzhniy, Ingulets), pond
volumes ranging 200 - 500 mln m3, with tailings flow rates from 45,000 to 100,000 m3/hour;
height of dikes up to 100 m;
- Poltava Ore Concentration Integrated Works (Ukraine) tailing pond with hydraulic
transportation system (flow rate of 70,000 m3/hour), total volume of 300 mln m3;
- Kamysh-Burun Ore Concentration Integrated Works tailing pond on muddy underlying soil
30 m thick, seismicity force up to 7, total volume of 50 mln m3;
- Solid wastes burial of 23 000 m3 for Biela Tserkva Tire Aggregated Works;
- Azerbaijan Ore Concentration Integrated Works tailing pond with hydraulic transport
system (flow rate of 3,000 m3/hour), total volume of 15 mln m3, height of the dam - 80 m,
seismicity force - up to 7;
- Liquid waste storage of Crimean Soda Factory with natural salt lakes used as dumps;
- Chiatura Ore Concentration Integrated Works (Georgia) tailing pond - 25 mln m3, area
seismicity force - up to 8, hydtaulic transport flow rate - 4,000 m3/hour, operating 4 vertical
12 m diameter thickeners designed by UVKP;
- Ash storage for "Azovstal" factory (Ukraine) located on the Azov sea shelf.
Many other waste storages / tailing ponds designed for different natural conditions and
various customers' demands.
- Consumer / drinking water supply systems
- Vilia-Minsk water supply system for the city of Minsk (Bielorussia) - about 30 years in operation, includes water storages on the Vilia and Svisloch rivers and 5 pumping stations;
flow rate - 15 m3/sec.
- Karachun water storage of 300 mln m3 capacity for the Kryviy Rig city water supply;
- Water treatment & finishing plants, capacities ranging 14,000 - 250,000 m3/24 hours;
- Water well intakes, flow rates of 14,000 - 50,000 m3/24 hours.
- Water supply systems for plant use
- Technical water supply systems (river intake, water treatment and transport to consumer),
particularly for "Azot" (Nitrogen) Production Association, flow rates ranging 50,000 - 180,000 m3/24 hours;
- Circular water supply systems for ore concentration plants in Kryviy Rig region with total capacity of about 7 mln m3/24 hours, and others in Ukraine, Georgia, Azerbaijan, Uzbekistan, capacities ranging 0.25-3.6 mln m3/hours;
- Water demlneralization plants for "Azot" (Nitrogen) Production Assosiation (Cherkassy, Ukraine) - 25,000 m3/hours, for Navoyi Chemical Integrated Works (Uzbekistan) - 8,000 m3/24 hours;
- Sewerage systems
|